Inside View

Irvine: Ribbon Cutting of New 9292 Warehouse and Packaging Building

The Irvine facility reached an important historical mile- stone to expand the operations from one building at 9342 Jeronimo to include a newly built-out Warehouse, Office and Packaging areas in the 9292 building. We have sustained operations in the 9342 building since inception of Alliance Medical Products until our warehouse move in December 2017 followed by the fun ribbon cutting event in January 2018 to move in the visual inspection, labeling, and packaging operations. The buildout provides much needed warehouse space to accommodate new product growth with 800 new pallet locations for CRT and refrigeration; office space on second floor, and to accommodate new integrated serialization equipment for packaging. Our 9342 building will focus on sterile aseptic filling operations and will continue to expand to meet future product demand in various sterile delivery forms.

Many special features were incorporated in the Ware- house buildout to meet new building code regulations for insulation, fire protection, full temperature mapping, and in pallet bin separation to maximize material isola- tion controls; fulfilling compliance requirements.